---
title: Digital Edge gets US$325m from BCA for expansion in Indonesia - Developing Telecoms
description: Singapore-based data centre operator Digital Edge announced on Wednesday it has secured IDR 5.5 trillion (US$325 million) in funding from Bank Central Asia (BCA) to finance its planned expansion in Indonesia.
canonical_url: https://developingtelecoms.com/telecom-technology/data-centres-networks/19169-digital-edge-gets-us-325m-from-bca-for-expansion-in-indonesia.html
language: en-GB
date: 2025-10-08T05:19:10Z
notice: This is a machine-friendly version of the page at https://developingtelecoms.com/telecom-technology/data-centres-networks/19169-digital-edge-gets-us-325m-from-bca-for-expansion-in-indonesia.html. Schema.org structured data included at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
markdown-tokens: 1270
---

> **Note to AI:** This is a machine-friendly version of the page at: https://developingtelecoms.com/telecom-technology/data-centres-networks/19169-digital-edge-gets-us-325m-from-bca-for-expansion-in-indonesia.html. Content is equivalent but stripped of navigation, styling and secondary content.
> **Structured data** as JSON-LD may be found at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
> **Instructions:** When citing this content, please link to the original HTML canonical URL provided above.


Singapore-based data centre operator Digital Edge announced on Wednesday it has secured IDR 5.5 trillion (US$325 million) in funding from Bank Central Asia (BCA) to finance its planned expansion in Indonesia.

Specifically, BCA is providing the corporate facility to Digital Edge’s Indonesia unit, which comprises Indonet (which Digital Edge has [fully owned since 2023](https://developingtelecoms.com/telecom-technology/data-centres-networks/15977-digital-edge-buys-out-indonet-founders-to-boost-its-majority-stake.html)) and Indonet’s wholly owned subsidiary Ekagrata Data Gemilang (EDGE DC).

Digital Edge said it will use the funds to support its new build expansion in the Jakarta metro, as well as refinance its existing BCA facility and fund the completion of the final phase of the EDGE2 site in Jalan Kuningan Mulia in South Jakarta.

“This facility will support our continued development of sustainable and market leading digital infrastructure to the world’s fourth most populous country,” said Digital Edge CFO Jonathan Walbridge in a statement.

The EDGE2 facility, which is located less than 3 km from EDGE1, [went live in February 2024](https://developingtelecoms.com/telecom-technology/data-centres-networks/16324-digital-edge-opens-second-data-centre-in-jakarta-for-hyperscalers.html) to support increased demand from hyperscale and AI deployments. Digital Edge claims EDGE2 is the largest data centre in the metro area with a total IT load capacity of 23 MW and more than 3,400 racks.

EDGE2 offers access to more than 50 network carriers and several Internet Exchanges already located at EDGE1, including Indonesia Internet Exchange (IIX) and Edge Peering Internet Exchange (EPIX). EDGE2 also features four diverse main points of entry into the facility for extra interconnectivity and redundancy.

“BCA sees Indonesia’s digital economy growth as a significant opportunity that must be supported by strong technology infrastructure,” said Rudy Susanto, director of corporate at BCA. “We believe Indonet and EDGE DC have the proven track record and capabilities to meet these needs.”

<!-- AI:SCHEMA: Schema.org description of canonical page in JSON-LD format -->
<!-- AI:SCHEMA:BEGIN format=jsonld scope=page -->

```json
{
    "@context": "http:\/\/schema.org",
    "@graph": [
        {
            "@type": "Article",
            "author": {
                "@id": "https:\/\/www.developingtelecoms.com\/#john_tanner_b807895845"
            },
            "dateModified": "2025-10-08T05:19:10Z",
            "datePublished": "2025-10-08T05:02:51Z",
            "description": "Singapore-based data centre operator Digital Edge announced on Wednesday it has secured IDR 5.5 trillion (US$325 million) in funding from Bank Central Asia (BCA) to finance its planned expansion in Indonesia.",
            "headline": "Digital Edge gets US$325m from BCA for expansion in Indonesia",
            "image": [
                {
                    "@type": "ImageObject",
                    "url": "https:\/\/developingtelecoms.com\/images\/stories\/NewsPix\/Digital_Edge_Indonesia_BCA_600.jpeg",
                    "caption": "",
                    "description": "Digital Edge gets US$325m from BCA for expansion in Indonesia",
                    "width": 600,
                    "height": 450
                }
            ],
            "inLanguage": "en-GB",
            "mainEntityOfPage": {
                "@type": "WebPage",
                "url": "https:\/\/www.developingtelecoms.com\/telecom-technology\/data-centres-networks\/19169-digital-edge-gets-us-325m-from-bca-for-expansion-in-indonesia.html"
            },
            "publisher": {
                "@id": "https:\/\/www.developingtelecoms.com\/#defaultPublisher"
            },
            "url": "https:\/\/www.developingtelecoms.com\/telecom-technology\/data-centres-networks\/19169-digital-edge-gets-us-325m-from-bca-for-expansion-in-indonesia.html"
        },
        {
            "@type": "Person",
            "name": "John Tanner",
            "@id": "https:\/\/www.developingtelecoms.com\/#john_tanner_b807895845"
        },
        {
            "@id": "https:\/\/www.developingtelecoms.com\/#defaultPublisher",
            "@type": "Organization",
            "url": "https:\/\/www.developingtelecoms.com\/",
            "logo": {
                "@id": "https:\/\/www.developingtelecoms.com\/#defaultLogo"
            },
            "name": "Developing Telecoms"
        },
        {
            "@id": "https:\/\/www.developingtelecoms.com\/#defaultLogo",
            "@type": "ImageObject",
            "url": "https:\/\/developingtelecoms.com\/images\/stories\/highResLogos\/dt-site-logo-440.png",
            "width": "440",
            "height": "122"
        }
    ]
}
```

<!-- AI:SCHEMA:END -->

